Warragamba Dam Bulk Storage Facility

This project involves the design and documentation of a new Operational
Storage Facility for the Sydney Catchment Authority Bulk Water Division.The new building is to replace the former facility, which was lost during the bushfires of Christmas 2002.

The building performs two roles. The first is to provide an efficient and
functional storage facility for the Bulk water Division. The second more
poetic role is to provide an entrance or “Gateway” to the heritage listed
Haviland Park, the main public focus of Warragamba Dam.

The proposal achieves this through a linear timber screening element,
which slides along the edge of the building and carport.